Olaf Wieghorst

Behind Schedule

MEDIUM: Oil on canvas

DIMENSIONS: 34 x 48 inches

Signed lower left

SHIPPING DIMENSIONS:

SOLD FOR: $ 40,950.00

Including Buyers Premium

CONTACT US

Email: info@scottsdaleartauction.com Phone: (480) 945-0225

DISCLAIMER

Please note that the first unframed photo is most accurate for color. Framed photographs are to show the frame and are not color corrected to the painting. *The Condition Reports are for guidance only and should not be relied upon as statements of fact, and do not constitute a representation, warranty, or assumption of liability by Scottsdale Art Auction. Scottsdale Art Auction strongly encourages in-person inspection of items by the bidder. All lots offered are sold “AS IS”. Please refer to item two in our terms and conditions for further information.